{"id":70266,"date":"2026-07-28T17:40:31","date_gmt":"2026-07-28T13:40:31","guid":{"rendered":"https:\/\/magpie.ae\/staging4\/?p=70266"},"modified":"2026-07-29T12:20:38","modified_gmt":"2026-07-29T08:20:38","slug":"guggenheim-abu-dhabi-gets-its-opening-date-11-december-2026","status":"publish","type":"post","link":"https:\/\/magpie.ae\/staging4\/guggenheim-abu-dhabi-gets-its-opening-date-11-december-2026\/","title":{"rendered":"Guggenheim Abu Dhabi gets its opening date: 11 December 2026"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>It may have taken 20 years, but at last we have a firm opening date for Guggenheim Abu Dhabi. On 11 December it joins New York, Venice and Bilbao in the Guggenheim Foundation\u2019s desire to bring post-1960s art to the world in stunning buildings.<\/strong><\/p>\n\n\n\n<div class=\"wp-block-kadence-image kb-image70266_fbacbb-1d\"><figure class=\"alignright size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"533\" src=\"https:\/\/magpie.ae\/staging4\/wp-content\/uploads\/2026\/07\/Detail-Shot-Guggenheim-Abu-Dhabi-1-copy.webp\" alt=\"\" class=\"kb-img wp-image-70269\"\/><\/figure><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Designed by the late Frank Gehry, Guggenheim Abu Dhabi features ten sculptural cones that punctuate the building&#8217;s skyline \u2013 nine clad in stainless steel mesh and one in onyx and glass \u2013 reaching heights of up to 88m and providing natural ventilation and shade. It\u2019s impressive, yet (hopefully) functional.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It&#8217;s also big. Inside there are 30 galleries connected by a central atrium, a total of 11,600 square metres of interior space; there\u2019s another 23,000m<sup>\u00b2<\/sup> of exterior exhibition space in the cones and terraces around the building.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That makes Guggenheim Abu Dhabi the&nbsp;largest Guggenheim museum by overall building size, and still the largest in terms of indoor exhibition space (Bilbao has about 9,000m<sup>\u00b2<\/sup>). <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It will also be the largest in the UAE \u2013 the nearby Louvre Abu Dhabi has about&nbsp;9,200m\u00b2&nbsp;of permanent galleries, so the Guggenheim would appear to be 26% larger even before you include its outdoor exhibition areas. (As yet there are no floorspace figures for the proposed Dubai Museum of Modern Art, the only other potential competitor size-wise; Tadao Ando&#8217;s design runs to five floors but reportedly only two of them are for exhibition space.)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The official word is that the museum will offer \u201cnew perspectives on modern and contemporary art from an Abu Dhabi lens \u2026 Guggenheim Abu Dhabi reflects a transcultural approach, moving beyond chronology and geography to highlight artistic lineages, networks, and exchanges\u201d.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It has actually been building its collection since 2009, with a broad range of media \u2013 as you\u2019d expect from a Guggenheim \u2013 but with a specific emphasis on artists from West and South Asia and North Africa (WANASA, apparently) and a policy of presenting what\u2019s described as \u201ca global history of modern and contemporary art\u201d (rather than a Western-centred narrative) that will examine \u201cpoints of intersection and transcultural exchange\u201d. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Guggenheim Abu Dhabi was first announced in 2006, but the global financial crisis of 2008-9 prompted a more cautious approach to capital expenditure \u2013 instead of building all the projects all at once, the government elected to stagger investment in Saadiyat Cultural District. This would also seem to make more sense in terms of marketing, though last year saw a rush of openings:<\/p>\n\n\n\n<div class=\"wp-block-kadence-iconlist kt-svg-icon-list-items kt-svg-icon-list-items70266_d8ab1f-d5 kt-svg-icon-list-columns-1 alignnone\"><ul class=\"kt-svg-icon-list\">\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_3b8386-b2\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\">NYU Abu Dhabi Art Gallery <strong>Nov 2014<\/strong><\/span><\/li>\n\n\n\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_998dee-e7\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\">Louvre Abu Dhabi <strong>Nov 2017<\/strong><\/span><\/li>\n\n\n\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_8e6bdf-6c\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\">teamLab&nbsp;Phenomena&nbsp;Abu&nbsp;Dhabi <strong>Apr&nbsp;2025<\/strong> <em>not in the original plans<\/em><\/span><\/li>\n\n\n\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_135223-be\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\">Natural History Museum Abu Dhabi <strong>Nov 2025<\/strong><\/span><\/li>\n\n\n\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_4e294c-85\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\">Zayed National Museum <strong>Dec 2025<\/strong><\/span><\/li>\n\n\n\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_592d5a-ce\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\">Guggenheim Abu Dhabi <strong>Dec 2026<\/strong><\/span><\/li>\n\n\n\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_06b213-d3\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\"><a href=\"https:\/\/magpie.ae\/staging4\/abu-dhabi-to-get-its-performing-arts-centre\/\">Dar al Funoon<\/a> target <strong>2030<\/strong> <em>not in the original plans<\/em><\/span><\/li>\n<\/ul><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Dr Mari\u00ebt Westermann, formerly of NYUAD and now Director and CEO of the Solomon R Guggenheim Foundation, described Guggenheim Abu Dhabi\u2019s collection elegantly as \u201cuniquely local and global, centred in the region but with works from all continents.\u201d<br>As well as its exhibitions, Guggenheim Abu Dhabi plans to support artists through commissions, research, exhibitions and a multilingual public programme. It will be interesting to see the commissioning policy \u2026<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cRooted in Abu Dhabi and built for the world\u201d, says the blurb. That seems to us to be the wrong way around. We\u2019ll have to see how the collection and the curation pan out in practice, but Guggenheims (and maybe all art museums) seem to be more about bringing the world to the location. The principle (Guggenheim&#8217;s roots?) lies in presenting modern and contemporary art from around the world to a local audience, \u201cshining a light on art and artists\u201d as the blurb continues. Maybe \u201crooted in the world and built for Abu Dhabi\u201d would be more appropriate.<\/p>\n\n\n\n<div class=\"wp-block-group has-background\" style=\"background-color:#d8e9f9\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<h4 class=\"kt-adv-heading70266_82d6fe-e6 wp-block-kadence-advancedheading\" data-kb-block=\"kb-adv-heading70266_82d6fe-e6\">The timeline:<\/h4>\n\n\n\n<div class=\"wp-block-kadence-iconlist kt-svg-icon-list-items kt-svg-icon-list-items70266_03a162-ca kt-svg-icon-list-columns-1 alignnone kt-list-icon-aligntop\"><ul class=\"kt-svg-icon-list\">\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_b13eea-2b\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\"><strong>2006<\/strong> On 8 July, DCT Abu Dhabi\u2019s predecessor TDIC announced an agreement with the Solomon R Guggenheim Foundation to build a Guggenheim museum on Saadiyat Island to a design by Frank Gehry.<\/span><\/li>\n\n\n\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_a50cf1-2f\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\"><strong>2006-11 <\/strong>The global financial crisis of 2008\u201309 hit real estate and construction projects across the UAE. Abu Dhabi slowed or rephased a number of large capital projects, including most of those on Saadiyat Island. A more cautious approach to capital expenditure meant the government chose to stagger investment in the Cultural District rather than build all the museums simultaneously; the Louvre Abu Dhabi got the prime position.<\/span><\/li>\n\n\n\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_796f8f-0f\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\"><strong>2011<\/strong> Some site and structural work began on the Guggenheim, but construction was \u201ctemporarily\u201d suspended later the same year with the principal contracts said to be out for re-tendering. TDIC said the cancellation was down to a review of its project procurement strategy; industry analysts cited market conditions and cashflow pressures alongside the government\u2019s broader policy moves; contractor pricing was also assumed to be an issue \u2013&nbsp;Gehry has designed one of the most ambitious museum buildings ever, making procurement and construction \u201cunusually demanding\u201d as one insider put it.<\/span><\/li>\n\n\n\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_be2b33-47\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\"><strong>2011-2015<\/strong> The target completion date was pushed back multiple times with reported causes including contractual and supply issues. The target completion was later pushed again to 2017.<\/span><\/li>\n\n\n\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_4ead5c-47\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\"><strong>2017<\/strong> Some site work was continuing, but the main construction contracts had yet to be confirmed.<\/span><\/li>\n\n\n\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_d96436-22\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\"><strong>2019<\/strong> Construction was expected to be completed around 2023, said industry reports. \u201cAdditional facilities\u201d had been added, apparently.<\/span><\/li>\n\n\n\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_e3952a-51\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\"><strong>2021<\/strong> On 1 October the main construction contract was finally awarded to BESIX Group subsidiary Six Construct and Trojan Contracting. In September DCT Abu Dhabi confirmed the museum was \u201con track for 2025 completion\u201d.<\/span><\/li>\n\n\n\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_c71858-c4\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\"><strong>2021-25<\/strong> The 2025 date was gradually dropped in favour of \u201ccoming real soon\u201d statements which gradually coalesced into \u201cmid\/late 2006\u201d.<\/span><\/li>\n\n\n\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_b686c6-f9\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\"><strong>2026 <\/strong>At a Dubai Collection Nights conversation at Al Safa Library in February, Guggenheim Abu Dhabi project director Stephanie Rosenthal said the museum would open \u201ctowards the end of the year\u201d.<\/span><\/li>\n\n\n\n<li class=\"wp-block-kadence-listitem kt-svg-icon-list-item-wrap kt-svg-icon-list-item-70266_7b4b46-5c\"><span data-name=\"USE_PARENT_DEFAULT_ICON\" data-stroke=\"USE_PARENT_DEFAULT_WIDTH\" data-class=\"kt-svg-icon-list-single\" class=\"kadence-dynamic-icon\"><\/span><span class=\"kt-svg-icon-list-text\"><strong>2026 <\/strong>On 26 July an official press release confirmed the opening date as 11 December 2026.<\/span><\/li>\n<\/ul><\/div>\n<\/div><\/div>\n\n\n\n<p class=\"kt-adv-heading70266_4fffdc-f9 wp-block-kadence-advancedheading\" data-kb-block=\"kb-adv-heading70266_4fffdc-f9\"><strong>More information is available from the official press release <a href=\"https:\/\/www.guggenheim.org\/press-release\/abu-dhabi-announces-opening-of-guggenheim-abu-dhabi\">here<\/a>, and much more should be available on the <\/strong><a href=\"https:\/\/www.guggenheimabudhabi.ae\/en\"><strong>website<\/strong><\/a><strong> \u2013 though at the time of writing it\u2019s still under construction, ironically enough. You can still sign up for emails, though.<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-kadence-image kb-image70266_faf858-67 size-large\"><img decoding=\"async\" src=\"https:\/\/magpie.ae\/staging4\/wp-content\/uploads\/2026\/07\/Guggenheim-Abu-Dhabi-side-1024x682.webp\" alt=\"\" class=\"kb-img wp-image-70268\"\/><\/figure>\n","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\">It may have taken 20 years, but at last we have a firm opening date for Guggenheim Abu Dhabi. On 11 December it joins New York, Venice and Bilbao in the Guggenheim Foundation\u2019s desire to bring post-1960s art to the <a class=\"mh-excerpt-more\" href=\"https:\/\/magpie.ae\/staging4\/guggenheim-abu-dhabi-gets-its-opening-date-11-december-2026\/\" title=\"Guggenheim Abu Dhabi gets its opening date: 11 December 2026\"> [&#8230; more]<\/a><\/div>\n","protected":false},"author":1,"featured_media":70267,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[146],"tags":[],"class_list":["post-70266","post","type-post","status-publish","format-standard","has-post-thumbnail","category-museums"],"_links":{"self":[{"href":"https:\/\/magpie.ae\/staging4\/wp-json\/wp\/v2\/posts\/70266","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/magpie.ae\/staging4\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/magpie.ae\/staging4\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/magpie.ae\/staging4\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/magpie.ae\/staging4\/wp-json\/wp\/v2\/comments?post=70266"}],"version-history":[{"count":0,"href":"https:\/\/magpie.ae\/staging4\/wp-json\/wp\/v2\/posts\/70266\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/magpie.ae\/staging4\/wp-json\/wp\/v2\/media\/70267"}],"wp:attachment":[{"href":"https:\/\/magpie.ae\/staging4\/wp-json\/wp\/v2\/media?parent=70266"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/magpie.ae\/staging4\/wp-json\/wp\/v2\/categories?post=70266"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/magpie.ae\/staging4\/wp-json\/wp\/v2\/tags?post=70266"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}